Spare part discontinued: what to do when a machine module is no longer available?

When a module is discontinued, there is usually still time: the manufacturer often continues to supply it as a spare part, but not indefinitely. First back up programs and parameters, check the delivery status of all critical parts and decide how you would bridge a failure. Then plan the replacement with the successor in a downtime that you choose yourself.

Selected customers

  • Logo of Lufthansa Technik AG
  • Logo of Krones AG
  • Logo of Fraunhofer-Gesellschaft
  • Logo of ÜSTRA Hannoversche Verkehrsbetriebe AG
  • Logo of Sesotec GmbH
  • Logo of Komax SLE GmbH & Co. KG
  • Logo of Flottweg SE
  • Logo of Christ Packing Systems GmbH & Co. KG
  • Logo of Die Autobahn GmbH des Bundes
  • Logo of Mannesmann Line Pipe GmbH
  • Logo of REFORM
  • Logo of PRAMAC
  • Logo of SAR Electronic GmbH

What to do when a spare part is discontinued?

A phase-out means that the manufacturer is letting the product expire. It usually remains available for some time, at first regularly, later only as a spare part. During this time you proceed in five steps:

  1. Check the status: look up delivery status and dates at the manufacturer, for all modules of the machine, not just for the one part.
  2. Back up the current state: back up programs, parameters and firmware versions of controller, panel and drives and check whether the backup can be restored.
  3. Bridge a failure: decide how you would cover a failure until the modification: own stock, second-hand part or repair.
  4. Clarify the successor: determine a suitable successor and what changes in program, wiring and tests with the replacement.
  5. Plan the modification: schedule the replacement or retrofit in a downtime that you choose yourself.

It becomes expensive when the module fails first and is searched for afterwards. Then the delivery time determines how long the machine is down.

How long is a discontinued part still available?

Each manufacturer decides this for itself. Many manufacturers of automation technology publish the life cycle of their products with dates. These phases are typical:

PhaseMeaningWhat you do
Activeregularly availableback up the current state, check the status annually
Phase-outend of regular supply announcedclarify the successor, schedule the modification, define the bridging solution
Spare partonly available as a spare part, often with longer delivery time and higher priceschedule the modification, check stock
Endno longer available, no repair by the manufactureronly second-hand market or repair, modification urgent

One example is the SIMATIC S7-300: Siemens announced the phase-out in October 2023, it has had spare part status since October 2025, and spare parts are available until October 2033.

Life cycle of the SIMATIC S7-300Timeline: active until October 2023, phase-out until October 2025, then spare part status until October 2033, afterwards no longer available.ActivePhase-outSpare partEndOct. 2023Phase-outOct. 2025Spare partOct. 2033End of spare parts2022202420262028203020322034YearAs of Nov. 2026
Figure 1: Life cycle of the SIMATIC S7-300 with the dates for phase-out notice, spare part status and end of spare parts supply.Source: Siemens, life cycle information on the SIMATIC S7-300; own illustration

The S5 already reached its end on 30 September 2020. How the change from S7-300 to S7-1500 works is described in the article PLC migration to S7-1500.

Check the status for the exact article number on the type plate. In some families, individual modules expire earlier than the rest.

Which parts of a machine should be checked first?

First the parts whose failure stops the machine and which cannot simply be replaced by another product. A list of critical parts with these columns is enough to start with:

ColumnContent
Moduledesignation, manufacturer, article number, firmware version
Locationmachine, control cabinet, equipment designation
Delivery statusphase and dates according to the manufacturer, date of the query
Consequence of failuremachine stops, partial function fails or operation can continue
Replacement availablepart in stock, second-hand part obtainable, repair possible
Backupprogram and parameters backed up, date, storage location
Successorproduct, effort for the replacement, planned date

How to set the order of priority

Order of priority for critical partsMatrix of delivery status and consequence of a failure. First: machine stops and part in spare part status or at end. Next: machine stops and part in phase-out. Otherwise monitor.ActivePhase-outSpare part or endDelivery statusMachine stopson failureMonitorNextFirstno spare in stockNo downtimeon failureMonitorMonitorMonitor
Figure 2: Order of priority for critical parts by delivery status and consequence of a failure. If a spare part is in stock, the part moves from First to Next.Source: own illustration
  • First: machine stops on failure, part in spare part status or at end, no replacement in stock.
  • Next: machine stops on failure, part discontinued, replacement available or obtainable.
  • Monitor: part active or failure without downtime.

Typical candidates are the controller and its modules, operator panels, frequency converters and servo controllers, safety controllers, communication modules and older industrial PCs.

Stock, second-hand part, repair or successor: what fits when?

Until the modification you need a way to cover a failure. Each has its limits:

OptionSuitable ifLimit
Own spare parts stockpart is still available and is needed on several machinesties up capital, parts age in stock, check the firmware version
Second-hand partpart is at end, a failure has to be bridged at short noticeorigin and condition often unclear, no guarantee of service life
Repairdefect can be narrowed down and a repair service for the module is availablerarely economical for frequency converters, servo controllers and panels, duration uncertain
Fit the successorsuccessor is available and the effort for the replacement is knownprogram, wiring and tests are affected
Retrofitseveral parts are expiring or the controller is at endplannable downtime required

In the event of a failure, as part of our repair service we replace the module with a spare part and transfer parameters, firmware and program. If the part is no longer available, we propose a successor. Component-level repair rarely pays off for frequency converters, servo controllers and panels.

What changes when a successor is fitted?

A successor rarely fits one to one. Check these points before the replacement:

  • Mechanics: dimensions, mounting and space in the control cabinet, heat dissipation
  • Connection: terminals, connectors, supply, cables to motor and encoder
  • Communication: fieldbus, addresses, telegrams and device description files
  • Program: blocks, parameters and screens, for controllers often a migration to a new programming environment
  • Safety: safety functions in the module, such as safe drive functions or safety programs

Is the replacement a substantial modification?

According to the 2015 interpretation paper of the German Federal Ministry of Labour (BMAS), a successor with the same function and the same safety level is not a substantial modification. If new functions are added or safety functions change, assess the modification. How this looks from 2027 under the Machinery Regulation is described in the article Machinery Regulation 2027.

Independently of this, in Germany the operator must have the machine inspected by a person qualified to carry out inspections after a modification subject to inspection and before it is used again (Section 14 (3) BetrSichV). What belongs in the report after the replacement is shown in the article Commissioning report after a retrofit.

How do you prevent spare part shortages?

Three things help most:

  1. Current backups: without program and parameters, even an available spare part cannot be commissioned. With NIKLAS CARE we back up programs and check the versions regularly.
  2. List of critical parts: create it once and check the delivery status annually, then no phase-out comes as a surprise.
  3. Plan the modification in good time: if several parts of a machine are expiring, a complete modification pays off instead of many individual replacements.

During the free Retrofit Check on site we record the control and drive technology of your machine, check the delivery status and show which parts should be replaced first. Whether a modification or a new machine pays off is shown in the article Retrofit or new machine. More on the modification under machine retrofit.

Frequency converter and servo motor in the control cabinet of a machine

Frequently asked questions about discontinued spare parts

Short answers on phase-out, bridging and successor.

What does discontinued mean?

The manufacturer has announced that it will no longer supply the product regularly. This is usually followed by a period in which it is only available as a spare part, after which it is no longer available.

Does a machine with a discontinued controller have to be modified immediately?

No. The machine may continue to run. What matters is that you can bridge a failure and plan the modification before the part is no longer available.

Are second-hand parts a good solution?

As a short-term bridge yes, permanently no. Origin, condition and service life are often unclear, and the supply shrinks over time.

How do I find out whether a part is discontinued?

With the article number from the type plate at the manufacturer. Many manufacturers show delivery status and dates in their online catalogue or support portal.

Does the machine need a new CE marking after the replacement?

Not if function and safety level remain the same. Then there is no substantial modification. The machine must still be inspected after a modification subject to inspection.

Can you also replace parts from manufacturers other than Siemens?

Yes. Give us the manufacturer and article number of the module and we will check the delivery status and successor. We provide remote assistance throughout Germany if data and remote access are sufficient, and on site we work in the Regensburg area.

Request a Retrofit Check

State the machine, controller and the parts that are discontinued. We will get back to you with an appointment for the free Retrofit Check.

We process your details to handle your enquiry. See our privacy policy.

Simon Niklas, your contact

Simon Niklas

Mechanical engineer, M.Sc.

+49 941 56956720[email protected]

“Good engineering proves itself in day-to-day production. That is why we combine technical planning with a close understanding of process, operation and maintenance.”

Book a consultation